|
1.WaterThe planned water supply is 412 tons daily, with average water consumption of 2.96 million tons per day.
| Domestic water | 1.5yuan/m3 | | Industrial water | 1.9yuan/m3 | | Water for commerce, service industry and construction industry | 3.4yuan/m3 | 2.Electricity
- | Common Electricity | Large amount of electricity comsumption from 101 to 3000kVA | High demand on electricity consumption of over 3001kVA | | Domestic and agricultural electricity | 0.73 | | | | Electricity for commerce and service industry | 0.89 | 0.77 | 0.72 | | Industrial electricity (including some dirculation industries) | 0.75 | 0.65 | 0.6 | 3.LPG
| Domestic gas | 10.37yuan/m3 | | Comercial gas | 13.48yuan/m3 | 4.Communications 1)Fixed network communications fees
| Basic monthly rental for non-residential users | 35 yuan per month for each telephone set | | Local call fees | Within operation area Operation segments | 0.22 yuan for the first 3 minutes, and 0.11 yuan for each minute since the fourth minute 0.20 yuan/once (1 minute for each time) | | Toll fees | Domestic International Hong Kong, Macao, and Taiwan | 0.07 yuan/6 seconds 0.8 yuan/6 seconds 0.2 yuan/6 seconds | 2)Mobile communications fees
| Domestic water | Basic monthly rental 50 yuan per user per month | | Industrial water | 0.4 yuan per minute | | Water for commerce, service industry and construction industry | Basic mobile conversation fees+Corresponding toll call fees | 3)Internet service
- | Openning account and installation (yuan per subscriber) | Network access fees (yuan per subscriber per month) | Remarks | | ADSL virtual dialing | 880 | 630 | Commercial user | | IP MAN(5M) | 1000 | 2800 | Commercial user | | ADSL virtual dialing | 380 | 200 | Residential user | The communications fees mentioned above are the basic ones stipulated by telecommunications companies, and the communications cost can be reduced by a big margin by employing the IP conver sation mode or the preferential service packages design by the telecommunications companies. 5.Price on assignment of land use right
Unit:yuan per square meter for building area |
- | Nanshan Dist | Futian Dist | Luohu Dist | Yantian Dist | Longgang Distand Baoan Dist | | Commercial land | 1368-2579 | 1338-5509 | 1260-8039 | 1260-2184 | 579-1320 | | Office area | 1225-1968 | 1225-2792 | 1202-3144 | 1078-1732 | - | | Residential land | 679-1983 | 715-2564 | 816-2923 | 715-1388 | 423-854 | The prices on the assignment of land use right listed above are for reference, and the prices shall subject to negotiation with property owners or through bidding and tender.
- | Longgang Grand Industrial Area | Hi-Tech Industrial Park | Futian Bonded Area | | Price of land | 145-200 | 130-170 (multiplies building area) | 800-2800 | 6.Rent of office building/workshop/warehouse
Unit:yuan per meter per month |
| - | Nanshan Dist | Futian Dist | Luohu Dist | Yantian Dist | Longgang Distand | Baoan Dist | | Office building | Highrise | 13-48 | 30-70 | 35-130 | 25-65 | 6-55 | 8-60 | | Multi-storey | 14-50 | 30-60 | 15-45 | - | - | - | | Workshop | 12-28 | 15-40 | 8-15 | 13-22 | 4-13 | 5-14 | | Warehouse | 10-17 | - | 6-10 | 10-25 | 4-8 | 4-14 | 7.Average pay for employees
| - | Mannagement personnel | professional technical personnel | Production personnel | - | - | - | Senior technical personnel | Technical | Senior | Intermediate | Junior | Within SEZ | 2100-20000 | 1800-13000 | 3200-7000 | 2600-6500 | 1200-5400 | 900-4000 | 680-3600 | Out of SEZ | 1000-8000 | 1100-8200 | 2100-4900 | 2000-4400 | 1100-4000 | 750-3300 | 610-2500 | The labor cost mentioned above is an intermediate level and, according to Shenzhen's regulations, the lowest monthly pay within the SEZ is 595.00 yuan, while the lowest pay out of the SEZ is 46.00 yuan. 8.Insurance premium
| - | - | Undertaken by enterprises | Undertaken by individuals | Remarks | | Social endowment insurance | Basic pension insurance | 8% | 5% | | | Local supplementary pension insurance | 1% | - | | | Basic medical insurance | Comprehensive medical insurance | 7% | 2% | Permanent residents | | Hospitalization medical insurance | - | 2% | Temporary residents | | Employment injury insurance | 6.4-19.4 | - | yuan per person per month | | Unemployment insurance | 8.6 | - | yuan per capita per month | | Public accumulation fund for housing construction | 15% | - | | | Total approximate insurance premium | 31% | 9% | | Note: The insurance premiums with % are to be calculated and drawn as per monthly pay. 9.Industrial and commercial registration charge
| 0.08% of the total registered capital below 10 million yuan (including 10 million yuan); additional 0.04% for the sum exceeding 10 million yuan; and no more will be collected for the part exceeding 100 million yuan. | 10.Cost of capital construction
| The cost of construction for industrial workshops is about 500-1000 yuan per square meter. | 11.Cost of transportation 1)Cargo keeping and service fees for customs supervision warehouse
Unit of charging: per day |
| - | Indoor warehouse | Outdoor warehouse | | Common cargos | 3.7 yuan per square meter | 0.8 yuan per square meter | | Container | 20 feet | - | 25 yuan for each | 40 feet | - | 50 yuan for each | | Vehicle | - | 25 yuan per vehicle Note: 8 tons to 10 tons | 2)Cost of transportation of containers
| - | Yantian Port | Shekou Port and Chiwan Port | | Within SEZ | 650-750 | 600-700 | | Out of SEZ | 750-850 | 700-800 |
|