| Chinese | Japanese | Korea | BIG5 |
 
Investment Cost
 

1.WaterThe planned water supply is 412 tons daily, with average water consumption of 2.96 million tons
per day.
Domestic water 1.5yuan/m3
Industrial water 1.9yuan/m3
Water for commerce, service industry and construction industry 3.4yuan/m3

2.Electricity
Unit:yuan/kwh

-
Common Electricity
Large amount of electricity comsumption from 101 to 3000kVA
High demand on electricity consumption of over 3001kVA
Domestic and agricultural electricity
0.73
Electricity for commerce and service industry
0.89
0.77
0.72
Industrial electricity (including some dirculation industries)
0.75
0.65
0.6

3.LPG
Domestic gas 10.37yuan/m3
Comercial gas 13.48yuan/m3

4.Communications
1)Fixed network communications fees
Basic monthly rental for non-residential users 35 yuan per month for each telephone set
Local call fees Within operation area Operation segments 0.22 yuan for the first 3 minutes, and 0.11 yuan for each minute since the fourth minute 0.20 yuan/once (1 minute for each time)
Toll fees Domestic International Hong Kong, Macao, and Taiwan 0.07 yuan/6 seconds
0.8 yuan/6 seconds
0.2 yuan/6 seconds

2)Mobile communications fees
Domestic water Basic monthly rental 50 yuan per user per month
Industrial water 0.4 yuan per minute
Water for commerce, service industry and construction industry Basic mobile conversation fees+Corresponding toll call fees

3)Internet service
-
Openning account and installation (yuan per subscriber)
Network access fees (yuan per subscriber per month)
Remarks
ADSL virtual dialing
880
630
Commercial user
IP MAN(5M)
1000
2800
Commercial user
ADSL virtual dialing
380
200
Residential user

The communications fees mentioned above are the basic ones stipulated by telecommunications companies, and the communications cost can be reduced by a big margin by employing the IP conver sation mode or the preferential service packages design by the telecommunications companies.
5.Price on assignment of land use right
Unit:yuan per square meter for building area

-
Nanshan Dist
Futian Dist
Luohu Dist
Yantian Dist
Longgang Distand Baoan Dist
Commercial land
1368-2579
1338-5509
1260-8039
1260-2184
579-1320
Office area
1225-1968
1225-2792
1202-3144
1078-1732
-
Residential land
679-1983
715-2564
816-2923
715-1388
423-854

The prices on the assignment of land use right listed above are for reference, and the prices shall subject to negotiation with property owners or through bidding and tender.
Unit:yuan/m2

-
Longgang Grand Industrial Area
Hi-Tech Industrial Park
Futian Bonded Area
Price of land
145-200
130-170
(multiplies building area)
800-2800

6.Rent of office building/workshop/warehouse
Unit:yuan per meter per month

-
Nanshan Dist
Futian Dist
Luohu Dist
Yantian Dist
Longgang Distand
Baoan Dist
Office building Highrise
13-48
30-70
35-130
25-65
6-55
8-60
Multi-storey
14-50
30-60
15-45
-
-
-
Workshop
12-28
15-40
8-15
13-22
4-13
5-14
Warehouse
10-17
-
6-10
10-25
4-8
4-14

7.Average pay for employees
Unit:yuan per month

-
Mannagement personnel
professional technical personnel
Production personnel
-
-
-
Senior technical personnel
Technical
Senior
Intermediate
Junior
Within SEZ
2100-20000
1800-13000
3200-7000
2600-6500
1200-5400
900-4000
680-3600
Out of SEZ
1000-8000
1100-8200
2100-4900
2000-4400
1100-4000
750-3300
610-2500

The labor cost mentioned above is an intermediate level and, according to Shenzhen's regulations, the
lowest monthly pay within the SEZ is 595.00 yuan, while the lowest pay out of the SEZ is 46.00 yuan. 8.Insurance
premium
-
-
Undertaken by enterprises
Undertaken by individuals
Remarks
Social endowment insurance
Basic pension insurance
8%
5%
Local supplementary pension insurance
1%
-
Basic medical insurance
Comprehensive medical insurance
7%
2%
Permanent residents
Hospitalization medical insurance
-
2%
Temporary residents
Employment injury insurance
6.4-19.4
-
yuan per person per month
Unemployment insurance
8.6
-
yuan per capita per month
Public accumulation fund for housing construction
15%
-
Total approximate insurance premium
31%
9%

Note: The insurance premiums with % are to be calculated and drawn as per monthly pay. 9.Industrial and
commercial registration charge
0.08% of the total registered capital below 10 million yuan (including 10 million yuan); additional 0.04% for the sum exceeding 10 million yuan; and no more will be collected for the part exceeding 100 million yuan.

10.Cost of capital construction
The cost of construction for industrial workshops is about 500-1000 yuan per square meter.

11.Cost of transportation 1)Cargo keeping and service fees for customs supervision warehouse
Unit of charging: per day

-
Indoor warehouse
Outdoor warehouse
Common cargos
3.7 yuan per square meter
0.8 yuan per square meter
Container
20 feet
-
25 yuan for each
40 feet
-
50 yuan for each
Vehicle
-
25 yuan per vehicle
Note: 8 tons to 10 tons

2)Cost of transportation of containers
Yuan per container

-
Yantian Port
Shekou Port and Chiwan Port
Within SEZ
650-750
600-700
Out of SEZ
750-850
700-800

 

      

©2003 Shenzhen High-tech Industrial Park